• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看
      建虎網 節省時間成本,讓工作學習變得更高效!www.worldcc.cn

      清淤換填施工技術交底記錄.doc

      更新時間: 2024-02-29
      下載權限: 免費會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數:
      上傳會員: 龍龍
      所屬欄目: 路橋技術交底
      進入下載頁
      資料簡介

      交底內容:
      1、清淤時應先在路基兩側臨時筑堰,抽干積水,再挖除塘底淤泥軟土至原狀土。
      2、淤泥軟土清除完畢后,進行砂礫墊層(厚30cm)的施工,接著鋪設土工隔柵,隨后用30cm道渣和30cm素土間隔分層壓實回填至地表面。
      3、砂礫材料的最大粒徑應小于50mm,通過5 mm篩孔的粒料應小于35%,粒徑小于0.5的粒料應不大于12%,不均勻系數應小于10%。
      4、砂礫墊層的施工采用機械壓實碾壓,將符合要求的砂礫材料經拌和均勻后攤鋪在清理好的基底上。砂礫分層攤鋪,逐層壓實,完工后的砂礫墊層表面不能出現坑洼不平。
      5、土工格柵縱橫向拉伸屈服力不小于20KN/M,規格型號為TGSG20—20。
      6、土工格柵應沿開挖邊坡鋪至原清表地面,沿路基橫斷面方向反包2m,縱向外翻2m。土工格柵縱向與道路橫向一致,兩幅間搭接采用塑料帶綁扎,綁扎間距25cm,兩幅間搭接寬度大于20cm,并在鋪設的土工格柵上每隔2m用U型釘固定于地面。
      7、鋪設完畢的土工格柵應及時回填覆蓋防止日曬老化。施工中禁止施工車輛在土工隔柵上行使,隨時檢查土工隔柵的質量,發現有折損、刺破、撕裂等,視程度或更換,或修補。修補范圍超過裂口至少30cm。
      8、鋪設完土工格柵之后,應按照素土——道渣——素土——道渣的順序依次往上回填。
      9、道渣碎石料應有良好的級配,最大粒徑小于100mm,通過75mm篩孔的粒料大于90%,小于5mm的細料占20%~40%,石料壓碎值不大于35%。
      (轉下頁)
      Cards on the table contents:
      1, dredging should be built first in the embankment on both sides of the temporary weir, pumping out water, and then the soft soil excavation pond sludge to undisturbed soil.
      2, after removal of silt soft soil, for sand and gravel cushion (thickness 30cm) of construction, then laying Geogrids, then use the 30cm and 30cm factor ballast layer compacted backfill soil interval to the surface.
      3, gravel material should be less than the maximum diameter of 50mm, through the 5 mm sieve of the aggregate should be less than 35% of the aggregate size of less than 0.5 should not exceed 12%, coefficient of uniformity should be less than 10% .
      4, gravel cushion construction with mechanical compaction rolling, will meet the requirements of the gravel paving material by mixing in clean-up after even a good substrate. Paving gravel layer, layer compaction, after the completion of the gravel cushion appeared rested on the jagged surface can not.
      5, longitudinal and transverse geogrid tensile yield strength of not less than 20KN / M, specification model TGSG20-20.
      6, geogrid should be paved along the excavated slope to clear the table the original ground-based cross-section along the direction of anti-package 2m, vertical valgus 2m. Geogrid Vertical and horizontal line the road, between two overlapping plastic with lashing, lashing spacing 25cm, width greater than the overlap between two pieces of 20cm, and geogrid laid on every 2m fixed with U-nails ground.
      7, laying the geogrid should be completed in time to prevent the sun and aging backfill cover. Prohibit the construction of the construction vehicles Geogrids exercise, at any time check the quality of Geogrids, found folded, piercing, tearing, etc., depending on the extent or replacement, or repair. Patches covering more than rip at least 30cm.
      8, after laying geogrid completed, should be in accordance with the factors of soil - ballast - prime territory - ballast filling up the order.
      9, Road slag aggregates should have good gradation, maximum particle size less than 100mm, 75mm sieve the aggregate by more than 90%, less than 5mm of fine material, 20% ~ 40%, stone crushing value is not more than 35%.
      (Next page)
       

      下載地址

      前往下載

      主站蜘蛛池模板: 吉木乃县| 蜜桃草视频免费在线观看| 欧美精品一产区二产区| 无码色综合| 蜜臀aⅴ国产精品久久久国产老师| 2021国产成人精品久久 | 人妻熟妇乱又伦精品HD| 中文无码妇乱子伦视频| japan黑人极大黑炮| 亚洲伊人色| 亚洲色大成网站www久久九| 国产精品疯狂输出jk草莓视频| 欧美黑吊大战白妞| 国产精品1区2区3区在线播放| 国产福利社| 久久精品人人槡人妻人人玩| 国内自拍偷拍一区二区三区| 久久午夜夜伦鲁鲁一区二区| 狠狠躁天天躁中文字幕无码| 国产粉嫩粉嫩的18在线播放91| 久草福利视频| 浓毛老太交欧美老妇热爱乱| 农村乱色一区二区高清视频| 国产一区二区一卡二卡| 911精品人妻一区二区三区A片| 伊人www| 91在线播放免费不卡无毒| 国产亚洲福利在线视频| 久久精品夜夜夜夜夜久久| 成人欧美一区在线视频| 超碰人人摸| 在线无码免费的毛片视频| 欧美人与动牲交A免费观看| 91福利影院| 夫妻自拍偷拍| caoporn成人免费公开| 风韵丰满熟妇啪啪区老熟熟女| 人妻少妇精品性色av蜜桃| 亚洲无码成人| 国产AV一区二区三区天堂综合网 | 野花在线观看免费观看高清|