      交底內(nèi)容:
      1.  本處理地段粉噴樁樁徑Ф500mm(攪拌鉆頭不小于Ф500mm),采用42.5級(jí)普通硅酸鹽水泥。每加固1m土體摻入水泥量為55kg,單位樁長(zhǎng)水泥用量的負(fù)值偏差應(yīng)控制在8%以?xún)?nèi),單樁水泥用量負(fù)值偏差應(yīng)控制在5%以?xún)?nèi)。
      2.  采用兩噴四攪法施工,自上而下攪拌,自下而上噴粉攪拌,攪拌頭上提噴分時(shí)的提升速度為0.5~1m/min。為保證粉體攪拌均勻,須進(jìn)行全樁長(zhǎng)復(fù)攪,復(fù)攪速度也應(yīng)控制在0.5~1m/min,為保證樁底噴灰量據(jù)管道的送灰時(shí)間,提升鉆具前提前噴灰,不充許先提升鉆具后噴灰,停灰面為施工地面下0.5m處,復(fù)攪時(shí)管道壓力不宜過(guò)大,以不堵塞出氣孔為原則,防止鉆孔淤泥向四周擠壓形成空洞。
      3.  測(cè)放樁位按設(shè)計(jì)要求進(jìn)行,在確定孔位時(shí),需經(jīng)復(fù)核確認(rèn)后方可進(jìn)入下一施工工序,為保證樁位的準(zhǔn)確性,樁位必須打入木樁或插入竹片作為樁位標(biāo)記。
      4.  下鉆桿時(shí),先使樁機(jī)安置在標(biāo)定的孔位上,使鉆頭中心對(duì)準(zhǔn)孔中心,桿位偏差在±5cm以?xún)?nèi),調(diào)整樁機(jī)水平度及垂直度,保證孔斜率不大于1.5%,終孔后校正鉆具,樁徑偏差不得大于4%。
      下鉆桿攪拌前要通過(guò)地面試噴清水,檢查噴粉設(shè)備和管路系統(tǒng)、設(shè)備的壓力和排量必須滿足設(shè)計(jì)要求;管路系統(tǒng)的密封圈必須良好,各通道和噴嘴內(nèi)不得有雜
       

      Cards on the table contents:
      1. The processing site DJM pile diameter Ф500mm (mixing drill not less than Ф500mm), with 42.5 ordinary portland cement. Strengthening 1m per volume of soil mixed with cement 55kg, unit pile length of the negative deviation of cement content should be controlled within 8%, a negative deviation of single pile of cement consumption should be controlled within 5%.
      2. Using two four-jet mixing method construction, top-down mixing, bottom-up powder mixing, spray mixing head to mention time-enhancement rate 0.5 ~ 1m/min. Stir to ensure powder, to carry out the whole pile length complex mix, complex mixing speed should be controlled at 0.5 ~ 1m/min, to ensure the spray pile ash gray, according to time of delivery channels to enhance the drill in advance of spraying dust, and not allow drilling to upgrade after the first spray gray, stop gray-0.5m below ground for the construction of office, complex mix when the pressure pipe should not be too big to not plug the pores in principle, to prevent the drilling mud to form a cavity around the extrusion.
      3. Measuring Pile up by design requirements, in determining the hole, the need to be confirmed by the review into the next construction process, in order to ensure the accuracy of the Pile, Pile must be inserted into the stakes or bamboo as the pile bit tag.
      4. Under the drill, the first to pile driver placed in the calibration of the holes, so that the drill center hole aligned center pole position deviation within ± 5cm to adjust the level of degree and verticality of pile driver, to ensure the slope is not greater than hole 1.5%, after the correction of the final hole drilling, pile diameter deviation of not more than 4%.
      Stirring before the next drill pipe to the interview by spraying water, check the spray equipment and piping systems, equipment, pressure and displacement to meet the design requirements; piping system must have good seal, the channel and nozzle may have mixed
       

      下載地址

      前往下載

      主站蜘蛛池模板: 欧美大香线蕉线伊人久久| 久久精品国产成人午夜福利| 久久亚洲精品11p| 日韩人妻无码精品专区综合网| 久草精品视频| 色翁荡熄又大又硬又粗又视频图片 | 亚洲最大成人av免费看| 久久久精品中文字幕乱码18| 永久精品视频| 国产精品视频一区国模私拍| 与子乱对白在线播放单亲国产| 美女自卫慰黄网站| 天堂网亚洲综合在线| 国产精品午夜无码AV在线播放| 欧美成人一区二区三区不卡| 午夜免费视频国产在线 | 国产内射性高湖| 亚洲精品不卡无码福利在线观看| 业余自由性别视频视频| 欧洲人妻丰满av无码久久不卡| 天堂网av最新版在线看| 国产午夜亚洲精品国产成人| 精品久久久久久中文字幕女| 超碰66| 亚洲老女人区一区二视频| 无码人妻久久一区二区三区| 精品无码日韩国产不卡av| 中文文精品字幕一区二区| 人妻精品动漫h无码| 成人午夜伦理在线观看| 75香蕉在线综合| 国产一区二区人大臿蕉香蕉| 中国老太婆video| 国产91?在线播放九色潘多| 少妇一夜三次一区二区| 国产精品白丝喷水jk娇喘视频| 欧美国产日产一区二区| 国产av黄色一区二区三区| a片网| 伊人97| 亚洲va在线va天堂va四虎|