      交底內(nèi)容:
      1. 對(duì)實(shí)際開(kāi)挖深度≤5.0m地段的基坑,上面1.2m采用1:1放坡,坡面噴射C15混凝土硬化層,下面采用拉森鋼板樁支護(hù);若遇到相對(duì)較差土層,采用密排拉森鋼板樁支護(hù)。鋼板樁頂設(shè)一道支撐,支撐選用32號(hào)雙翼工字鋼。
      2. 對(duì)實(shí)際開(kāi)挖深度>5.0m地段的基坑,采用密排鋼板樁支護(hù),樁頂以下0.5m設(shè)一道支撐,支撐選用32號(hào)雙翼工字鋼,水平間距不大于4.0m。
      3. 施工過(guò)程中要加強(qiáng)對(duì)基坑的監(jiān)測(cè),每隔20.0m設(shè)一個(gè)沉降和位移觀測(cè)點(diǎn),發(fā)現(xiàn)有異常情況時(shí)及時(shí)采取應(yīng)急處理措施,如采取回填反壓土或坑頂卸土的方法。
      4. 基坑降水采用井點(diǎn)降水,保證水位在坑底以下0.5m;施工過(guò)程要做好排水工作,坑底、坑頂均應(yīng)設(shè)排水溝(400×350)和集水井(1000×1000×800)。
      5. 基坑土方開(kāi)挖采取分段、分層開(kāi)挖,每層開(kāi)挖深度不大于1.5m,每段開(kāi)挖長(zhǎng)度小于40.0m。坑底以上30.0cm土采用人工開(kāi)挖,以免擾動(dòng)原狀土。
      基坑施工過(guò)程中,在2.0m范圍內(nèi)嚴(yán)禁大型載重車(chē)輛行走,保證基坑安全;同時(shí)基坑周邊應(yīng)設(shè)鋼圍欄。
      Cards on the table contents:
      1. On the actual excavation site of the excavation depth ≤ 5.0m, 1.2m above the 1:1 cut slope, slope jet C15 concrete hardening, the following support by Larsen sheet pile; If they are in relatively poor soil using closely spaced steel sheet pile retaining Larsen. Set up a steel sheet pile head support wings 32, I-beam support used.
      2. On the actual excavation depth> 5.0m lot of excavation, using closely spaced steel sheet piles, pile top the following set up a 0.5m support wings 32, I-beam support used, the horizontal spacing of not more than 4.0m.
      3. The construction process should strengthen the foundation of the monitoring, at intervals of 20.0m set up a settlement and displacement of observation point, when an abnormality is detected in time to take contingency measures, such as to backfill compacted soil or pit the top anti-dumping earth approach.
      4. Foundation pit dewatering used to ensure the water level at the Bottom of the following 0.5m; the construction process to make the drainage work, pit bottom, pit roof drains should be located (400 × 350) and the set of wells (1000 × 1000 × 800).
      5. Earthwork excavation pit to section, layered excavation, excavation depth of each layer is not greater than 1.5m, the length of each piece of excavation is less than 40.0m. Bottom 30.0cm above artificial excavation of soil, undisturbed soil to prevent disturbance.
      Foundation construction process, is strictly prohibited in the 2.0m range of large-scale load vehicles to ensure the Pit; the same time should be set steel fence around the pit.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 天天躁日日躁狠狠躁欧美老妇| 亚洲国产午夜精品理论片在线播放| 亚洲综合色区另类av| 伊人视屏| 久久怡红院国产精品| 熟女人妻aⅴ一区二区三区电影 | 成人午夜av在线播放| 精品人妻一区二区三区-国产精品| 国产精品成人不卡乱码| 国产欧美日韩亚洲更新| 久久波多野结衣av| 国产无遮挡又黄又大又爽| 午夜精品福利亚洲国产| 黑人国产在线| 国产97人人超碰CAO蜜芽PROM| 亚洲第一视频免费在线| 丰满少妇内射一区| 亚洲欧美偷拍另类A∨| 国产精品蜜臀av在线一区| 4455亚洲| 99热这里只有精品最新地址获取| 美女极度色诱视频国产免费| 亚洲国产精品久久久久婷蜜芽| 国产精品人| 亚洲高清WWW色好看美女| 亚洲国产精品成人av网| 国产熟女精品视频| 18禁黄无遮挡网站免费| 亚洲AV永久无码精品天堂动漫| 2021最新国产在线99| 苍井空一区二区波多野结衣av | 一卡二卡中文字幕| 亚洲国产综合在线区尤物| 99精品久久免费精品久久| 制服丝袜美腿一区二区| 四川乱子伦95视频国产| 国产精品热久久毛片| 亚洲成A人片在线观看日本| av无码av无码专区| 国产老头多毛Gay老年男| 国语高潮无遮挡无码免费看|