B、施工組織設(shè)計(jì)建議書
表1 施工組織設(shè)計(jì)文字說(shuō)明
一、施工組織設(shè)計(jì)編制說(shuō)明
(一)編制依據(jù)
1、某禹門口至閻良高速公路土建工程C01合同段招標(biāo)文件、參考資料、標(biāo)前答疑及有關(guān)補(bǔ)遺資料。
2、某省公路勘察設(shè)計(jì)院提供的有關(guān)設(shè)計(jì)圖紙、設(shè)計(jì)文件、設(shè)計(jì)資料。
3、交通部頒發(fā)的現(xiàn)行規(guī)范、規(guī)程、規(guī)則、驗(yàn)標(biāo)、公路工程施工定額、概預(yù)算編制辦法。
4、現(xiàn)場(chǎng)踏勘調(diào)查所獲得的有關(guān)資料。
5、我公司擁有的科技工法成果和現(xiàn)有的管理水平、勞力設(shè)備、技術(shù)能力,以及長(zhǎng)期從事公路建設(shè)所積累的豐富的施工經(jīng)驗(yàn)。
(二)編制范圍
某禹門口至閻良高速公路土建工程C01合同段,即設(shè)計(jì)里程K0+000~K11+750全長(zhǎng)11.75Km范圍內(nèi)的土建工程,內(nèi)容包括路基、路面、橋梁、立交、沿線設(shè)施等,達(dá)到交通部頒發(fā)的現(xiàn)行的交付驗(yàn)收標(biāo)準(zhǔn),并辦理交驗(yàn)為止的全過(guò)程。
(三)編制原則
1、嚴(yán)格遵守招標(biāo)文件所規(guī)定的工程施工工期,招標(biāo)合同條款以及招標(biāo)文件的各項(xiàng)要求,根據(jù)工程的特點(diǎn)和輕重緩急,分期分批組織施工,在工期安排
B, construction organization design proposals
Table 1 shows the construction organization design language
First, note the construction organization and design
(A) prepared on the basis
1, a C01 Yumenkou to Yanliang Expressway civil works contracts section of tender documents, reference materials, standard information before answering, and the addendum.
2, a province of the Highway Survey and Design Institute to provide design drawings, design documentation, design data.
3, Ministry of Communications issued by the existing norms, procedures, rules, standard inspection, road construction scale, almost budgeting.
4, site visit survey obtained information.
5, our company has the technology construction method results and the existing level of management, labor, equipment, technical capacity, and accumulated long been engaged in extensive road Jianshe of construction experience.
(B) the preparation of the scope of
Yanliang Yumenkou to civil works of a highway contract C01 segment, which designs mileage K0 +000 ~ K11 +750 full 11.75Km within the civil works, including roadbed, road, bridge, interchange, along the facilities, to transportation issued by the Ministry of delivery of acceptance of existing standards and handle the whole process up for examination.
(C) Basis of preparation
1, strict compliance with the provisions of the tender documents by the project construction period, the tender terms of the contract and the requirements of the tender documents, according to the characteristics of projects and priorities, stages of construction, the arrangements in the period