表9.4 施工方案或施工組織設計
第一章 編制依據、原則及范圍
第一節(jié) 編制依據
一、《西區(qū)中心莊路跨京津塘高速橋工程施工公開招標招標文件》。
二、業(yè)主提供的本工程招標圖紙及隨招標文件下發(fā)的相關設計資料。
三、招標文件關于編制標書的有關要求。
四、現行相關的國家及部頒設計規(guī)范、施工規(guī)范、驗收標準及有關文件,天津市、開發(fā)區(qū)及業(yè)主的有關規(guī)定。
五、招標期間招標單位與投標單位所有來往的函件及補遺資料。
六、我公司對施工現場實地勘察、調查資料。
七、我公司積累的成熟技術、科技成果、施工工法以及多年來從事同類工程的施工經驗。
八、我公司可調用到本工程的各類資源。
第二節(jié) 編制原則
一、安全第一的原則
在施工組織設計的編制中始終按照技術可靠、措施得力、確保安全的原則確定施工方案,在確保萬無一失的前提下組織施工。
二、優(yōu)質高效的原則
加強領導,強化管理,優(yōu)質高效。根據我們在施工組織設計中明確的質量目標,貫徹執(zhí)行ISO9001質量體系標準,積極推廣、使用“四新”技術,確保質量目標的實現。施工中
Table 9.4 Construction design or construction programs
The basis for preparing the first chapter, principles and scope of
Section prepared on the basis
1, "Western Center Village Road across Jingjintang High Speed Bridge construction tender of tender documents."
Second, owners of the engineering drawings and tender with the tender document by the relevant design information.
Third, preparation of tender documents on the relevant requirements of the tender.
Fourth, the existing relevant national and ministerial design, construction specifications, acceptance criteria and related documents, Tianjin Development Zone and the owners requirements.
5, during the tender bidding and bidding units of correspondence and all residual data.
6, the company on the construction site field survey, survey data.
7, the company accumulated a mature technology, scientific and technological achievements, construction method, and many years experience in similar works.
8, the company adjusted the various resources used in this project.
II compilation principles
First, the principle of safety first
In the preparation of construction organization design and always in accordance with the technology is reliable, effective measures to ensure the safety of the principle of determining the construction program, organized under the premise of ensuring foolproof construction.
Second, the principles of quality and efficiency
Strengthen leadership, management, quality and efficiency. According to our construction organization design in clear quality goals, the implementation of ISO9001 quality system standard, and actively promote the use of "four new" technology to ensure quality goals. Construction