• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看
      建虎網(wǎng) 節(jié)省時(shí)間成本,讓工作學(xué)習(xí)變得更高效!www.worldcc.cn

      二級(jí)建造師專業(yè)工程管理與實(shí)務(wù)試題及答案.doc

      更新時(shí)間: 2024-02-24
      下載權(quán)限: 免費(fèi)會(huì)員
      文件大。 0.01 MB
      文件類型: .doc
      瀏覽次數(shù):
      上傳會(huì)員: jjk1314
      所屬欄目: 建造/建筑師
      進(jìn)入下載頁(yè)
      資料簡(jiǎn)介

      一、單項(xiàng)選擇題(每題1分,共40分)

      1、填方路基應(yīng)事先找平,當(dāng)?shù)孛嫫露榷赣冢?)時(shí),需修成臺(tái)階形式。
      A.1:10
      B.1:5
      C.1:7
      D.1:8

      2、城市主干路、快速路的上、中面層瀝青混合料需要通過(guò)( )試驗(yàn)來(lái)檢驗(yàn)抗車轍能力,指標(biāo)是動(dòng)穩(wěn)定度。
      A.馬歇爾
      B.高溫車轍
      C.抗壓強(qiáng)度
      D.彎拉

      3、用網(wǎng)噴混凝土加固基坑壁施工時(shí),應(yīng)優(yōu)先選用硅酸鹽或普通硅酸鹽水泥,也可選用礦渣或火山灰硅酸鹽水泥,水泥強(qiáng)度等級(jí)不應(yīng)低于( )MPa.
      A.42.5
      B.27.5
      C.32.5
      D.35.5

      4、沉入混凝土樁時(shí),要求混凝土達(dá)到100%設(shè)計(jì)強(qiáng)度并具有( )齡期。
      A.14d
      B.21d
      C.28d
      D.36d

      5、吊裝或移運(yùn)裝配式鋼筋混凝土或預(yù)應(yīng)力混凝土構(gòu)件時(shí),當(dāng)?shù)趵K與構(gòu)件的交角小于( )時(shí),可不設(shè)吊架或扁擔(dān)。
      A.30度
      B.40度
      C.50度
      D.60度

      6、噴錨暗挖法施工中監(jiān)控量測(cè)的初始讀數(shù),應(yīng)在開(kāi)挖循環(huán)施工的24小時(shí)內(nèi),并在下一
      First, single-choice (1 point per question, 40 points)

      1, fill subgrade leveling in advance, the local surface slope steeper in (), the steps required to complete their forms.
      A.1: 10
      B.1: 5
      C.1: 7
      D.1: 8

      2, the urban main road, express way, the middle layer of asphalt mixture through a () test to test the resistance to rutting, indicators are dynamic stability.
      A. Marshall
      B. high temperature rutting
      C. strength
      D. flexural

      3, spray concrete reinforced with mesh foundation wall construction should be preferred or ordinary portland cement, slag or volcanic ash can also use Portland cement, concrete strength grade should not be less than () MPa.
      A.42.5
      B.27.5
      C.32.5
      D.35.5

      4, sinking concrete piles, the required design strength of concrete up to 100% and has () age.
      A.14d
      B.21d
      C.28d
      D.36d

      5, lifting or movement of prefabricated reinforced concrete or prestressed concrete structures, when the sling angle and less than component (), the could have no hanger or pole.
      A.30 degree
      B.40 degrees
      C.50 degrees
      D.60 degree

      6, spray anchor Transfer Project in Monitoring the initial reading should be in the excavation within 24 hours of the construction cycle, and in the next
       

      下載地址

      前往下載

      主站蜘蛛池模板: 沈丘县| 国产全黄三级国产全黄三级书| 亚洲无码成人| 久久天天躁狠狠躁夜夜avapp | 久久99精品国产99久久6尤物| 一区二区日本在线| 日本电影免费久久精品| 亚洲中文字幕精品第三区| 好湿好紧太硬了我太爽了视频| 国产中文字幕精品视频| 欧美性白人极品hd| 麻豆tv入口在线看| 白嫩少妇激情无码| 久久久久久一级毛片免费无遮挡| 国产精品露脸视频观看| 免费看无码自慰一区二区| 日日摸夜夜爽无码区| 黄片福利社| 亚洲无av在线中文字幕| 精品V精品V| 国产免费的视频一区二区| 国产成人综合亚洲欧美日韩 | 国产一区二区三四区| 国产久爱免费精品视频| 99在线精品国自产拍不卡| 国产成人精品亚洲精品| 国产美女一区二区三区| 亚洲人成网站观看在线观看| 久久精品中文字幕| 国产无套内射普通话对白| 成人免费精品网站在线观看影片| 亚洲免费网站观看视频| 欧美国产成人久久精品| 免费看无码网站成人A片| 国产成人99| 无码人妻精品一二三区免费| 亚洲中文字幕A| 韩国无码AV片午夜福利| 成人av久久一区二区三区| 中文字幕亚洲在线观看| 激情在线网|