• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看
      建虎網 節省時間成本,讓工作學習變得更高效!www.worldcc.cn

      基土釬探工程方案.doc

      更新時間: 2024-03-05
      下載權限: 免費會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數:
      上傳會員: 龍龍
      所屬欄目: 巖土施工
      進入下載頁
      資料簡介

       一、 施工準備
      (一) 材料要求
      砂:一般為中砂。
      (二) 主要機具
      1、 工打釬:一般鋼釬,用直徑φ22~25mm的鋼筋制成,釬頭是60°尖錐形狀,釬長1.8~2.1m;穿心錘(重10kg)。
      2、 機械打釬:輕便觸探器。
      3、 其他:麻繩或鉛絲、梯子(凳子)、手推車、撬棍(拔鋼釬用)和鋼卷尺等。
      (三) 作業條件
      1、 基土已挖至基坑(槽)底設計標高,表面應平整,軸線及坑(槽)長、寬均符合設計圖紙要求。
      根據設計圖紙繪制釬探點平面布置圖,確定釬探點位置及順序編號,按照釬探圖及有關規定進行釬探并記錄。釬探點的布置依據設計要求,當設計無要求時,應按規范規定執行,也可參照表l-l執行。
        Pit Slope Construction Scheme

          Beijing × proposed project, located in Beijing × × area × × Road east, south × ×. The project A, B, E Block, ground × × layer, C1, C2, C3, Block × ground floor, the whole place shear wall. 4 story frame structure of complex building, located 2 basement. Natural surface elevation of 36.30 m, ± 0.00 to 37.50 m elevation, based on depth of about 6.00 meters. '
      Narrow due to the construction site, in order to ensure the surrounding building (structures) based on the safety and smooth progress of construction shall be effective on the foundation support.
      The geological nature of the site see "Engineering Geological Investigation Report"
      2, pit slope design
      2.1 Design Basis
          1, Beijing × × Investigation Institute of the site area to provide "engineering geological investigation report"
          2, weight degree of unity is taken as r = 20kN/m3.
          3, overloading the ground by the general situation, consider q: 20kN/m3.
          4, design and calculation to follow the relevant norms of national and Beijing, including:
          "Building Foundation Design Code" (GB50007-2002)
          "Design of concrete structures" (GB50010-2002)
          "Technical Specification for Construction Excavation" (Jql20-99)
      2.2 design
          According to our construction experience in the Beijing area, combined with the actual situation similar projects, considering the technical security and economic rationality, use of shotcrete soil nail wall program. East, south to the slopes, a total of 4 rows of soil nails, from top to bottom length of the order of 5 meters, 6 meters, 5 meters, 4 meters, Anchorage 1Ф16, four rows Anchorage 1Ф18, spacing were 1.4 m, 1.3 m, 1.3 m, 1.4 m

      下載地址

      前往下載

      主站蜘蛛池模板: 国产美女做爰免费视频| 337p人体粉嫩胞高清图片| 亚洲另类午夜中文字幕| 亚洲婷婷综合色高清在线 | 国产精品午夜福利合集| 亚洲,一区二区三区精品视频| 人妻少妇亚洲| 起碰免费公开97在线视频| 精品久久久久久综合日本| 在线精品亚洲一区二区绿巨人| 大帝AV在线一区二区三区| 久久福利导航| 麻豆精品视频在线观看| 亚洲 欧美 中文 日韩 综合| 成人国产精品三上悠亚久久| 内射视频福利在线观看| 成人免费午夜无码视频在线播放| 国产不卡精品视频男人的天堂| 制服丝袜国产日韩酒店大堂经理| 欧美黑人巨大VIDEOS极品| 成人亚洲欧美成αⅴ人在线观看| 亚洲av与日韩av在线| 国产人妻777人伦精品hd| 久久99久久99精品免观看女同| 国产精品一区二区三区91| 伊人久久亚洲| 亚洲熟妇久久国内精品| 国产午夜精品久久久久免费视 | 无码国内精品久久人妻蜜桃| 亚洲毛片不卡AV在线播放一区| 国产永久免费高清在线观看| 肥东县| 热久久99这里有精品23| 四虎永久在线精品无码视频| 女人高潮流白浆视频| 国产在线不卡精品网站| 国产乱人对白| 亚洲欧美日韩综合一区二区| 午夜福利国产一区二区三区| 欧洲美熟女乱av亚洲一区| 国产女主播喷水视频在线观看|