      粉體噴射攪拌樁施工
      A. 施工方法
      a. 恢復(fù)中線,放出施工路段邊線樁,清理平整原地基使之滿足粉噴攪拌樁現(xiàn)場施工要求。
      b. 測量繪制方格網(wǎng)圖,準確定出樁位,其偏差不應(yīng)超過設(shè)計規(guī)定。
      c. 標定輸灰泵的輸灰量,灰粉到達噴灰口的時間,預(yù)攪下沉速度,噴灰攪拌提升速度,重復(fù)攪拌下沉速度,重攪拌提升速度等施工參數(shù),并進行試樁,使其強度達到設(shè)計要求。
      d. 樁機,設(shè)備安裝就位,調(diào)好平整度及導(dǎo)向架的垂直度,使粉體噴射攪拌樁的垂直度符合設(shè)計要求。
      e. 攪拌機預(yù)攪下沉,下沉過程中一般不沖水,如遇堅硬土層必須適量沖水時,要報經(jīng)監(jiān)理工程師批準,并考慮沖水對樁身強度的影響。
      f. 預(yù)攪下沉至設(shè)計深度后,起動輸灰泵,將符合質(zhì)量要求的固化材料(水泥或石灰),按設(shè)計用量、次數(shù)、速度,在規(guī)定深度,經(jīng)噴灰口邊續(xù)噴射,攪拌機械連續(xù)攪拌,并提升至距地面0.5m處。
      g. 重復(fù)攪拌下沉至樁底,再重復(fù)攪拌提升至距地面0.5m,最后用水泥土回填樁頭,并壓實養(yǎng)護。
      設(shè)專人記錄泵送固化材料的時間,
      Powder injection pile construction
      A. Construction Method
      a. recovery center line, construction of road sideline release pile, clean flat ground so as to meet the original powder jet mixing on-site construction requirements.
      b. Survey mapping grid map, accurately set the pile position, the deviation should not exceed the design requirements.
      c. calibration pump Ash Ash content, ash gray spray time of arrival, pre-mix sinking speed, increase speed jet ash mixing, stirring repeated sinking speed, re-mixing to enhance the speed of construction parameters, and test pile , its strength to meet the design requirements.
      d. Pile Driver, equipment installation in place, adjusted the guide frame smoothness and verticality, so that powder injection pile of verticality of the design requirements.
      e. pre-mixing sink mixer, sink process generally does not flush in case of hard soil to flush when appropriate, to report to the supervising engineer for approval and consider the impact of flushing of the shaft strength.
      f. pre-mix to the designed depth of sinking, the starting Ash pump, will meet the quality requirements of the curing material (cement or lime), according to design dosage, frequency, speed, depth specified by the spray of gray side continued injection, mixing continuous mechanical stirring, and raised to 0.5m from the ground office.
      g. Repeat mixing pile sinking to the bottom, and then repeat the stirring increased to from the ground 0.5m, the final backfill soil water trailer coupling, and Compaction.
      Hand pump set record time of curing materials,

      下載地址

      前往下載

      主站蜘蛛池模板: 国产精品久久久福利| 一面膜上边一面膜下边视频| 极品丰满久久久久熟妇| 亚洲天堂欧美| 亚洲AV日韩AV综合在线观看| 最新av中文字幕无码专区| 国内自拍视频在线一区| 伊人精品成人久久综合| 国产成人精品18| 国产人妻人伦精品1国产丝袜| 亚洲 日韩 国产 制服 在线 | 老司机精品成人无码AV| 17岁日本免费bd完整版观看| 国产成人一区二区三区影院动漫| 中文字幕精品1在线| 人妻少妇精品专区性色av| 日韩AV一区二区三区| 在线观看的av| 亚洲中文字幕人成影院| 精品偷拍| 天天操天天操天天操| 青青草国产一区二区三区| 99久久免费精品国产色| 在线观看gc一区| 欧洲美熟女乱又伦AV影片| 国产 欧美 亚洲 中文字幕| 越南毛茸茸的少妇| 无码人妻精品一区二区蜜桃百度| 亚洲乱人伦中文字幕无码| 久久av中文字幕资源网| 国产精品 亚洲 无码 在线| 国产精品久久久久久久专区| 国产午夜精品理论大片| 日本污视频在线观看| 久久精品亚洲欧美日韩久久| 色国产视频| 欧美精品综合一区二区三区| 亚洲人成电影网站色mp4| 熟妇与黑人一区二区三区乱码| 亚洲AV成人精品一区二区三区在线播放| 色婷婷亚洲六月色婷婷6月|