本工程為某市第一污水處理廠配套管網一期工程的一子項工程。根據業主提供的設計圖紙和現場勘察情況,結合招標文件的各項條款、說明和工程正式預算書,可以確定工程的施工要求比較高、時間緊、任務重。
為了使工程建設有條不紊的實施,確保質量好、速度快、造價低,我公司從本工程的性質、規模、施工地段的條件、業主對工期、質量的要求、勞動力調配、機械設備、材料供應、地質、氣候條件、夏(冬)雨季施工、文明安全施工、控制成本等各方面全局出發,統籌考慮,擬定一個科學合理的方案來指導施工,確保濟川路東延段污水管道工程全過程的施工的各個方面都能處于最佳受控狀態,克服施工中的盲目現象,有效地組織好濟川路東延段污水管道工程的施工,從而取得優質高效、低成本、文明施工的全面效益。
This project is the first city sewage treatment plant and the pipe network a project of a son projects. According to owners of the design drawings and site survey, and combined with the terms of tender documents, notes and project of the budget book, can determine the works required is relatively high, tight, heavy task.
To make an orderly implementation of the project construction to ensure good quality, fast, low cost, our company works from the nature, scale, construction site conditions, the owners of the schedule, quality requirements, the deployment of labor, machinery, materials supply, geological, climatic conditions in summer (winter) rainy season construction, civilization, security, construction, cost control and other aspects of the overall situation into consideration and develop a scientific and reasonable plan to guide the construction, to ensure the economic Sichuan Road eastern extension of sewage pipeline engineering the whole process of construction in all its aspects in the best controlled conditions, to overcome the phenomenon of the construction of the blind, to effectively organize economic Chuan Road eastern extension of the construction of sewage pipeline project, to obtain high quality and efficiency, low cost, the construction of the full benefits of civilization.