外高橋港區(qū)五期港外市政配套道路規(guī)六路排水工程施工組織設(shè)計(jì).doc
進(jìn)入下載頁
目 錄
一、編制依據(jù)
二、工程概況
三、施工組織管理措施
四、排水工程施工方案
五、工程質(zhì)量技術(shù)保證措施
六、安全文明生產(chǎn)及環(huán)境保護(hù)措施
七、施工進(jìn)度計(jì)劃及保證措施
八、主要施工機(jī)械設(shè)備及施工進(jìn)度計(jì)劃表
九、地下管線保護(hù)措施
十、雨期施工措施
十一、“渣土垃圾”整治措施
十二、施工便道
十三、單位工程、部位、工序工程劃分表
CONTENTS
1, prepared on the basis
Second, project profiles
3, Construction Management Measures
4, drainage construction program
5, engineering quality and technical assurance measures
6, safe and civilized production and environmental protection measures
7, the construction schedule and the assurance measures
8, the major construction equipment and construction progress schedule
9, underground pipelines protection
10 rain of construction measures
11, "garbage residue" Remediation measures
12, construction pavement
13, unit construction, location, process engineering division of the table
