①本標(biāo)工程系某大橋,建址在某原橋址。橋總長(zhǎng)547m,建設(shè)規(guī)模約¥3000萬(wàn)元,資金來(lái)源為中央預(yù)算內(nèi)基建投資與地方政府自籌。
②工程內(nèi)容及范圍:新安大橋工程施工設(shè)計(jì)圖全部?jī)?nèi)容及2座老橋拆運(yùn)。含兩端引道(2×91.5m),上、下橋人行道6處(180m)及行車道1處(125m)。
2、建筑結(jié)構(gòu)
①設(shè)計(jì)標(biāo)準(zhǔn):荷載為汽--20、掛--100,人群3.5kN/m2;地震基本烈度<6度,河道不通航,百年一遇洪水位▽129.20m。
① The standard engineering a bridge, built the original bridge site in a site. Bridge length of 547m, the scale of construction is about ¥ 3000 million, funded from the central budget and local self-investment in infrastructure.
② the content and scope of the project: Xin Bridge design drawing all the contents and two Old Bridge disassembling. With both ends of the approach roads (2 × 91.5m), on the bridge sidewalk 6 (180m) and lane 1 (125m).
2 structures
① Design Standards: load for the steam - 20, linked to - 100, population 3.5kN/m2; earthquake basic intensity of <6 degrees, non-navigable river, once in a century flood ▽ 129.20m.