• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看
      建虎網(wǎng) 節(jié)省時間成本,讓工作學(xué)習(xí)變得更高效!www.worldcc.cn

      施工現(xiàn)場的臨時照明.場內(nèi)交通及水電設(shè)施施工安全技術(shù)交底.doc

      更新時間: 2024-03-01
      下載權(quán)限: 免費會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數(shù):
      上傳會員: 龍龍
      所屬欄目: 安全文明
      進入下載頁
      資料簡介

      交底內(nèi)容   施工現(xiàn)場的臨時照明   室內(nèi)照明線路應(yīng)用瓷夾固定。電線接頭應(yīng)牢固,并用絕緣膠帶包扎。保險絲應(yīng)用電負荷量裝設(shè)。能產(chǎn)行大量蒸汽、氣體、粉塵等工作場所,應(yīng)使用密閉式電氣設(shè)備。有爆炸危險的工作場所應(yīng)使用防爆型電氣溫設(shè)備。電氣設(shè)備的傳動帶、轉(zhuǎn)輪、飛輪等外露部位必須安設(shè)防護罩。檢修電氣設(shè)備時應(yīng)按下列要求進行:電氣設(shè)備的檢修必須由電工進行,他人不得任意操作;工作中如遇停電拉下開關(guān),切斷電源,檢修結(jié)束必須仔細檢查各項設(shè)備的情況,沒有異常,方可合閘。大型電氣設(shè)備檢修應(yīng)在切斷電源、設(shè)好防護后進行,并在開關(guān)處設(shè)置警示標(biāo)牌,工作完成后方可拆除,如需進行送電試驗時,必須在認真檢查并與有關(guān)部門聯(lián)系后,方可進行。大型橋梁施工現(xiàn)場,隧道和預(yù)制場地,應(yīng)有自備電源,以免因電網(wǎng)停電造成損失和出現(xiàn)事故,自備電源和電網(wǎng)之間,要有聯(lián)鎖保護。
      場內(nèi)交通及水電設(shè)施  場內(nèi)道路應(yīng)經(jīng)常維護,保持暢通。載重車輛通過較多的道路,其彎道半徑一般不小于15m,特殊情況不得小于10m,手推車道路的寬度不小于1.5m。急彎及陡坡地段應(yīng)設(shè)置明顯交通標(biāo)志,與鐵路交叉處應(yīng)有專人照管,并設(shè)信號裝置和落桿。靠近河流和陡壁處的道路,應(yīng)設(shè)置護欄和明顯警告村志。場內(nèi)行駛斗、平車的軌道應(yīng)平坦順直,縱坡不得大于3%。車輛應(yīng)裝制動閘,鐵路終點應(yīng)設(shè)置倒坡和車檔。生產(chǎn)生活用水應(yīng)進行鑒定,其水質(zhì)必須符合國家現(xiàn)行標(biāo)準(zhǔn)。水源應(yīng)采取保護措施,防止水質(zhì)污染。場內(nèi)加設(shè)架設(shè)的電線應(yīng)絕良好,懸掛高度及線間距必須符合電業(yè)部門的安全規(guī)定。現(xiàn)場架設(shè)的臨時線路必須用絕緣物支持,不得將電線纏在鋼筋、樹木或腳手架上。電工在接近高壓線操作時,其安全距離為:10kv以下不得小于0.7m,20~35kv 不得小于1m,44kv不得小于 1.2m,否則必須停電后方可操作。各種電器設(shè)備應(yīng)配有專用開關(guān),室外使用的開關(guān)、插座外裝防水箱并加鎖,在操作處加設(shè)絕緣墊層。在三相四線制中
      Clarification at the construction site of the contents of the provisional application of porcelain lighting indoor lighting clip fixed lines. Wire connector should be firmly, and wrap with insulating tape. Application of electric load fuse installed. Nengchan line a lot of steam, gas and dust in the workplace, should be used enclosed electrical equipment. An explosive hazard in the workplace should use explosion-proof type electric temperature equipment. Electrical equipment belts, wheel, flywheel and other exposed parts must be fortified security guard. Maintenance of electrical equipment according to the following requirements: Electrical equipment maintenance must be carried out by the electrician, not arbitrary action of others; work, pull down the switch in case of power failure cut off power supply, repair the end of the device must be carefully check the situation, not unusual, before closing. Maintenance of large electrical equipment should be cut off the power, after setting a good defense, and set up warning signs in the switching office, only after the completion of demolition, For transmission tests carried out must be carefully checked and contacted the authorities, before conduct. Large-scale bridge construction site, tunnels and prefabricated space should bring their own power, to avoid losses due to power outage and the emergence of the accident, between self-supply and power grid, have interlocking protection.
      Pit road transport and water facilities, the venue should always maintain smooth. Truck traffic through more of roads, the bend radius is generally not less than 15m, exceptional circumstances may be less than 10m, the width of cart path is not less than 1.5m. Sharp bends and steep slope areas should set clear traffic signs, and railway intersections shall be hand care, and signaling devices, and drop shot set up. Office of rivers and steep roads, should be clearly warned that the village guard-rails and blog. Traveling inside bucket, flat cars flat track should be straight, grades shall not exceed 3%. Vehicle brakes should be installed, the railway terminal should be set down slope and car stalls. Water production should be identified, the water quality must meet the current standards. Water protection measures should be taken to prevent water pollution. Additional set up inside the wire should be absolutely fine, suspension height and line spacing must comply with safety requirements for electrical sector. On-site erection of the temporary line insulation support must not be entangled in the steel wires, trees or scaffolding. Near high voltage electrical operation, the safe distance: 10kv The following shall not be less than 0.7m, 20 ~ 35kv not less than 1m, 44kv not less than 1.2m, or to the rear blackout operational. All kinds of electrical equipment should be equipped with a special switch, outdoor switch, socket exterior waterproof box and locked, additional insulation in operating office cushion. In the three-phase four-wire system in
       

      下載地址

      前往下載

      主站蜘蛛池模板: 久久久www影院人成_免费| 狠狠干干| 成人亚欧欧美激情在线观看| 国产福利在线观看免费第一福利| 国产偷国产偷亚洲清高网站| 成人免费电影亚洲| 欧美人与动zozo在线播放| 成人免费AV一区二区三区| 国产一区视频一区欧美| 国产最新网址| 免费人成在线观看网站| 五月激情综合中文字幕| 色呦呦 国产精品| 四虎在线成人免费观看| 久久国产色av免费观看| 2021国产精品视频网站| 中文字字幕在线中文| 久久精品一区二区东京热| 亚洲综合91社区精品福利| 亚洲国产av系列精品麻豆| 精品自拍视频| 亚洲国产成人精品女久久| 国产精品999在线| 日韩中文AV| 伊人亚洲综合网色AV另类| 无套内射视频囯产| 国产成人综合亚洲AV第一页| 美女视频黄频A美女大全| 亚洲V无码一区二区三区四区观看| 国产精品久久无码一区| 99久久精品国产一区色| 国产一区二区在线有码| 一区二区国产高清视频在线| 亚洲精品系列| 欧美另类尿口扩张内视| 人人爽人人爽人人爽人人片av| 亚洲第一尤物视频在线观看导航 | 日韩av无码精品一二三区| 哟哟无码| 国产精品线在线精品| 国产欧美一区二区精品久久久|