      安全交底內容:
      1、 必須按施工組織設計進行施工。
      2、 搭設、拆除腳手架必須戴安全帽及穿軟底鞋。
      3、 外墻腳手架必須在主體結構施工以前搭設,并按照有關規定搭設安全檔板或者安全網;腳手架應高出工作面1.2M以上。
      4、 用于連接大橫桿的對接扣件,應避免開口向上設置,防止雨水侵入。
      5、 腳手架分段或搭設完畢,須經施工負責人、質安員驗收合格后,方可使用;高層建筑的外墻腳手架要采取卸荷措施。
      6、 在大風雨或停工一段時間后、應對腳手架進行全面檢查,如發現變形、下沉、鋼構件銹蝕嚴重,連接扣松脫等,要及時加固維修后方可使用。
      7、 拆除腳手架應設圍欄,拆除工作應由上而下,一步一清,不準上下同時作業,拆除物件不得往下投擲。
      8、 拆除大橫桿、剪刀撐時應先拆中間扣,再拆兩頭扣,由中間操作人員往下順傳竹桿。
      9、 遇大雨、雷、五級以上及夜間不得作業。
      用Φ6鋼筋預埋砼梁外邊,每3米水平設一道,待砼梁板拆除后,收緊鋼筋,再加回頭頂。
      Security cards on the table contents:
      1, must be constructed according to the construction organization design.
      2, erection, dismantling scaffolds must wear a helmet and wear soft-soled shoes.
      3, external scaffolding must be before the main structure construction, erection, and erection of security in accordance with relevant provisions of the tailgate or the safety net; scaffold should be higher than face 1.2M.
      4, a large bar for connecting the docking fasteners, should be set up to avoid openings to prevent water intrusion.
      5, section or scaffolding erection is completed, subject to construction of person in charge of quality inspection and acceptance by security guards only after use; high-rise building external scaffolding unloading measures to be taken.
      6, when the storm or after a period of suspension of work, scaffolding should conduct a comprehensive inspection, if found deformation, subsidence, severe corrosion of steel components, connecting buckle loose, they have to be repaired in time to use reinforcement.
      7, removal of the fence should be set up scaffolding, demolition work should be top-down, step one clear, closed down operations at the same time, removal of objects not throw down.
      8, removal of a large bar, scissors should be removed first, middle button, and then split two buttons, the operator by the middle of bamboo down the smooth transfer.
      9, heavy rains, thunder, and night shall not work more than five.
      Reinforced concrete beam embedded with Φ6 outside, set a level of 3 meters each, to be removed after the concrete slab, to tighten the steel, coupled back to top of the head.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 国产精品中文字幕在线看| 熟妇91| 青青国产成人久久91| 粗壮挺进人妻水蜜桃成熟| 亚洲午夜精品毛片成人播放| 久久精品国产99久久久古代| 无码高潮爽到爆的喷水视频app| 亚洲人成网站在线播放小说| 国产精品爽爽久久久久久| 久久综合色一综合色88| 久久久无码专区| 中文天堂最新版在线www| 91操碰| 在线观看免费污视频| 欧美freesex精品| 久久精品久久电影免费理论片| 黑人无码av| 欧美日韩国产图片区一区| 免费网站污| 影音先锋人妻啪啪AV资源网站| 精品网站999www| 妖精视频亚州无吗高清版| 狠狠色综合久久狠狠色综合 | 一级毛片免费观看不卡视频| 青青青爽在线视频观看| 亚洲色大成网站WWW久久| JIZZJIZZ国产| 九九视频精品13在线观看| 亚洲午夜久久久影院伊人| 国产杨幂AV在线播放| 精品香蕉一区二区三区| 一区二区三区91国产| 2020国产欧洲精品网站| 午夜福利激情一区二区三区| 亚洲日本三级| 一区二区三区国产| 中文字幕二区三区:| 国产午夜毛片V一区二区三区| 国产熟女露脸大叫高潮| 亚洲第一福利网站在线| 亚洲男人皇宫|