1、 進入施工現場必須遵守安全生產有關規定。
2、 鋪設車道板時,兩頭需擱置平穩,并用釘子固定,在車道板下面每隔1.5m需加橫楞、頂撐,2m以上的高空架道,必須裝有防護欄桿。
3、 車道板上應經常清掃垃圾、石子等以防行車受阻、人仰車翻。
4、 用塔吊、料斗澆搗混凝土時,指揮扶斗人員與塔吊駕駛員應密切配合,當塔吊放下料斗時,操作人員應主動避讓,應隨時注意料斗碰頭,并應站立穩當,防止料斗碰人墜落。
5、 車道板單車行走不小于1.4m寬,雙車來回不小于2.8m寬。
6、 在運料時,前后應保持一定的車距,不準奔走、搶道或超車。
7、 到終點卸料時,雙手應扶牢車把卸料,嚴禁雙手脫把,防止翻車傷人。
8、 離地面2米以上澆灌過梁、雨篷、小平臺等,不準站在搭頭上操作,如無可靠的安全設備時,必須戴好安全帶,并扣好保險鉤。
9、 使用振動機前應先檢查電源電壓,輸電必須安裝漏電開關,保護電源線路是否良好。
10、電源線不得有接頭,機械運轉應正常。振動機移動時不能硬拉電線,更不能在鋼筋和其它銳利物上拖拉,防止割破、拉斷電線而造成觸電傷亡事故。
11、井架吊籃起吊或放下時,必須關好井架安全門,頭、手不準伸入井架內,待吊籃停穩,方可進入吊籃內工作。
12、使用振動機的工人應手戴絕緣手套,腳穿絕緣橡膠鞋。
13、嚴禁酒后上班。
14、嚴禁安全帽放在一邊不佩戴。
15、所有的工人都不得從高處向下扔擲模板、工具等物體。
16、在樓板臨邊傾倒混凝土漿時應注意防止混凝土漿
Abstract:
1, into the construction site must comply with safety requirements.
2, laying Drive board, the two need to hold steady, fixed with nails, at intervals of 1.5m in the Drive board need to add the following cross-leng, top support, 2m above the high-altitude aircraft Road, to be equipped with protective railings.
3, Drive board should always clean up garbage, gravel, etc. to prevent traffic disruption, Yang cars were turned.
4, with a tower crane, hopper Pouring concrete, the command pilot Fu fighting personnel should cooperate closely with the crane, when the crane down the hopper, the operator should take the initiative to avoid, should meet in the hopper at any time pay attention to, and should stand firmly in place, to prevent the hopper touch people fall.
5, Drive Plate bicycle travel is not less than 1.4m wide, two-car back and forth not less than 2.8m wide.
6, in the transport material, the front of the car should maintain a certain distance, not allowed to run, grab Road or overtaking.
7, to the end of discharge, the hands should be supporting the handlebar discharge rate, is strictly prohibited hands off to prevent rollover injuries.
8, 2 m above the ground water away from the lintel, awning, a small platform, allowed to stand head and take action, without reliable security equipment, must wear seat belts and fastened Insurance hook.
9, using the vibration machine should be preceded by checking the supply voltage, the transmission leakage switch must be installed to protect the power supply line is good.
10, the power cord may not have connectors, mechanical operation should be normal. Vibration machine can not dead lift wires move, can not in steel and other sharp objects on the drag to prevent the cut, pull power lines caused by electric shock casualties.
11, Derrick basket lifting or down, you must turn off the derrick safety gate, head, hands are not allowed to reach into derrick, pending the basket a parked to enter the basket to work.
12, using the vibration machine workers should be wearing gloves, be wearing insulated rubber shoes.
13, forbidden to work after drinking.
14, is prohibited on the side of not wearing helmets.
15, all workers shall be thrown down from a height templates, tools and other objects.
16, the floor limb should pay attention to prevent the dumping of concrete slurry concrete slurry