順馳湖畔天城腳手架工程施工組織設(shè)計(jì).doc
進(jìn)入下載頁
蘇州順馳湖畔天城A區(qū)
腳手架工程施工組織設(shè)計(jì)
一、 施工概況
順馳湖畔天城位于蘇州工業(yè)園區(qū)。為配合A區(qū),10棟房屋的建造,特編制此腳手架施工組織設(shè)計(jì)。
其中A3.4.5棟為12層,總高度為36.2m, A1.2.6.7.8.9.10均為18層,大屋面標(biāo)高分別為55.10(A1.2)m,58.1m(A6.10), 54.10m(A7),53.60m(A8),53.60m(A9)。標(biāo)準(zhǔn)層高均為2.9m。
二、 編制依據(jù)及說明方式
1.《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》(JGJ130¬—2001)
2.特殊作業(yè)人員安全技術(shù)考核管理規(guī)定(GB5306—85)
3. 《高層建筑施工手冊(cè)》
4.建筑施工腳手架實(shí)用手冊(cè)(含垂直運(yùn)輸)中國(guó)建筑工業(yè)出版社
5.項(xiàng)目部提供的有關(guān)圖紙及資料。
三、 腳手架施工方案
A day the city of Suzhou Shunchi Lake District
Scaffolding construction organization design
1, Construction General
Shunchi Lake City is located in Suzhou Industrial Park days. In line with the A district, 10 homes were built, especially the preparation of the scaffold construction organization design.
A3.4.5 Building which is 12 floors in height of 36.2m, A1.2.6.7.8.9.10 are 18 floors, large roof elevation was 55.10 (A1.2) m, 58.1m (A6.10), 54.10m (A7), 53.60m (A8), 53.60m (A9). Standard story are 2.9m.
Second, the preparation and description method based on
1. "Steel tubular scaffolding construction safety technical specifications" (JGJ130 ¬ -2001)
2. Special operations personnel security technology assessment regulations (GB5306-85)
3. "Rise building construction manual"
4. Construction Scaffolding Practical Handbook (including the vertical transport) China Building Industry Press
5. The project to the Ministry of the drawings and information.
Third, scaffolding construction plan