番禺惠州天然氣開發項目終端場地回填與地基處理工程施工總結.doc
進入下載頁
終端場地位于珠海市橫琴島上,北距珠海保稅區不到1公里,西接磨刀門水道與珠海西區隔水相望,與珠海機場相距40多公里。珠海終端項目為天然氣處理廠,其天然氣來自惠州21-1油氣田、番禺30-1氣田,終端設計天然氣處理規模為4600000m3/d,總占地面積約330000m2。整個項目由中海石油(中國)有限公司(以下簡稱業主)投資建設,2004年4月業主通過邀請投標的方式擇優選擇并確定我方為終端場地回填與地基處理工程的項目總承包單位,并于2004年4月21日雙方簽訂了項目總承包合同,合同約定施工工期為150天。工作內容主要包括330000m2場地回填及其中242700m2地基處理的施工圖設計與施工。經業主審查同意,我方選擇了具備水運行業(港口)甲級設計資質的廣州港灣工程設
Terminal site is located in Zhuhai City Hengqin island, less than 1 km south of Zhuhai Free Trade Zone, west Modaomen resisting and Zhuhai across the Western, and more than 40 kilometers away from Zhuhai Airport. Natural gas terminal project in Zhuhai plant, its natural gas from oil and gas field, Huizhou 21-1, Panyu 30-1 gas field, gas processing terminal design size 4600000m3 / d, the total area of about 330000m2. Central entire project, CNOOC (China) Co., Ltd. (hereinafter referred to as owners) invest in, in April 2004 by inviting tender and the owners choose and determine our preferred venue for the backfill and foundation treatment for the terminal construction project general contracting, and in April 21, 2004 signed a total contract, the contract construction period is 150 days. Work mainly includes 330000m2 site backfill and foundation treatment in 242700m2 the construction design and construction. Reviewed and approved by the owners, we have chosen with shipping industry (port) class design quality set of Guangzhou Harbour Engineering