在2006年這一年內的時間里,我兢兢業(yè)業(yè)做好本職業(yè)工作,積極自覺利用節(jié)假日參與設施廠的加班加點工作。用滿腔熱情積極、認真地完成好每一項任務,嚴格遵守設施廠的各項規(guī)章制度,認真履行崗位職責,自覺按章操作;平時生活中團結同事、不斷提升自己的團隊合作精神。本人主要職責是負責交通工程的土建安裝、項目管理、工程竣工資料以及工程預結算資料歸檔工作,兼顧現(xiàn)場施工技術管理員。
現(xiàn)將我的工作情況作如下匯報有如下幾點:
01. 負責G105線(溫泉~陳田段)交通整治工程 I 標、II 標和G107線(大沙地~東莞交界)交通整治工程的竣工資料整理歸檔,以及現(xiàn)場施工指揮無線交通信號燈工程和標志安裝等多項工作。從這三個工程項目管理中,我更透切了解和掌握交通安全設施工程管理的奧秘:
a、從安排材料和機械進場、構件生產任務通知單、桿件材料成品、倉庫購買材料記入、施工任務通知單、直至到工程竣工驗收結算等各方面工作,無不緊湊嚴密;安排得當合理與否,是影響工程進度的一個重要因素。
b、在廠各個部門同時要相互協(xié)調,使人力、物力、財力等資源得到更充分發(fā)揮,工程項目造價就會淋漓盡致地表現(xiàn)出來,能夠充分把握住控制成本。例如,生產構件和施工技術是否按足設計圖紙和施工圖紙以及施工技術規(guī)范要求,若不然到工程竣工驗收時,質量監(jiān)督站勘查驗收會各項細節(jié)工作疏忽而定結論:該工程經(jīng)過現(xiàn)場驗收情況觀察仍存在不少問題(施工工藝不符合設計要求;構件生產成品尺寸沒有達到設計值;竣工資料不齊全,缺少材料質量證明原件,無相關檢測報告等)。
c、在交通信號燈工程方面,要考慮現(xiàn)
In 2006, the year of the time, I do this occupational work hard to actively and consciously use the facility, plant holidays, overtime. With enthusiastic positive, serious accomplish a task each, Yangezunshou facilities plant of the rules and regulations, seriously Lvxing post Zhize, consciously operate according to Zhang; normal life, unity and colleagues, to upgrade their team spirit. My main responsibilities of this civil installation of traffic engineering, project management, engineering data and completion of pre-settlement data archiving project, both on-site construction technology administrator.
We now make the following report on the work of the following points:
01. For G105 line (Spa ~ Chan Tin) marked Transportation Regulation Project I, II standard and the G107 line (the junction of Big Sandy ~ Dongguan) Traffic Regulation Project completion documentation archiving, and site construction projects commanding the wireless traffic signals and signs a number of installation work. From the three project management, I also carrying out a thorough understanding and knowledge of the mystery of traffic safety facilities project management:
a, from the arrangement of materials and mechanical approach, component production tasks notice, bar material product, credited to the purchase of materials storage, construction task notice, until final acceptance to the project settlement and other aspects of the work, are all tight close; arrangements for appropriate and reasonable or not, affect the progress of the project is an important factor.
b, while the various departments in the plant coordinated, so human, material, financial and other resources more fully, the project will cost side of it, to fully grasp the cost. For example, the production components and construction technology are the terms of the design drawings and construction drawings and construction specifications, if not to project completion acceptance O'clock, quality supervision Zhan Yan Shou Kuai exploration of the Xijiegongzuo negligence Erding Conclusion: This works through Xianchang Yanshouqingkuang observation still many problems (the construction process does not meet design requirements; component sizes of finished products did not meet the design value; completion information is not complete, lack of material proof of the original quality, no relevant test reports, etc.).
c, the traffic signal projects, to be considered is