奧體工程質(zhì)量監(jiān)督工作方案.doc
進(jìn)入下載頁(yè)
為提高監(jiān)督工作質(zhì)量,增加透明度,使監(jiān)督工作制度化、程序化,根據(jù)國(guó)務(wù)院《建設(shè)工程質(zhì)量管理?xiàng)l例》和國(guó)家有關(guān)建設(shè)法規(guī)、強(qiáng)制性標(biāo)準(zhǔn),制定南京奧體中心工程質(zhì)量監(jiān)督工作方案,請(qǐng)建設(shè)各方配合執(zhí)行。由于目前所出具的設(shè)計(jì)圖紙只到樁基工程,基礎(chǔ)、主體、屋面、裝飾、設(shè)備安裝等工程的監(jiān)督重點(diǎn),待其圖紙到位后另行制定。
To improve the quality of supervision, increase transparency, to enable the Authority to institutionalize procedures, and under the State Council's "Construction Engineering Quality Control Regulations" and the national laws and regulations related to construction, mandatory standards, has developed the Nanjing Olympic Sports Center project quality supervision scheme, construction with the implementation of the parties. Owing to the design drawings issued only to the foundations, foundation, subject, roofing, decoration, equipment installation supervision of the project focus, let it be developed after the drawings are in place.
