垂直運輸安全技術交底示例.doc
進入下載頁
垂直運輸安全技術交底
一、 塔式超重機作業安全技術交底
(1) 作業條件
(2) (1)超重機路基和軌道的鋪設,必須嚴格按照原廠使用規定及符合以下要求:
(3) ①軌距偏差不得超過其名義值的1/1000;
(4) ②在縱橫方向上鋼軌頂面的傾斜度不大于1/1000
(5) ③兩條軌道的接頭必須錯開。鋼軌接頭間隙在3~6mm之間,接頭處應架在軌枕上,兩端高差不大于2mm;
(6) ④距軌道終端1米處必須設置極限位置阻擋器,其高度應不小于行走輪半徑;
(7) ⑤路基旁應開挖排水溝;
(8) ⑥起重機在施工期內,每周或雨后慶以軌道基礎檢查一次,發現不符合規定時,應及時調整。
(9) (2)起重機的安裝、頂升、拆卸必須按照原廠規定進行,并制定安全作業措施,由專業隊(組)在隊(組)長負責統一指導下進行,并要有技術和安全人員在場監護。
(10) (3)起重機安裝后,在無載荷的情況下,塔身與地面的垂直度偏差值不得超過
(11) 3/1000。
(12) (4)起重機專用的臨時配電箱,宜設置在軌道中部附近,電源開關應合乎規定要求。電纜卷筒必須運轉靈活、安全可靠,不得拖纜。
(13) (5)起重機必須安裝行走、變幅、吊鉤高度等限位器和力矩限制器等安全裝置,并保證靈敏可靠。對有升降式駕駛室的起重,斷繩保護裝置必須可靠。
(6)起重機的塔身上,不得懸掛標語牌。
Vertical Transportation Safety Technology Details
First, overweight and machine operation safety Tower Technology Details
(1) Operating conditions
(2) (1) overweight roadbed and track laying machine to be used strictly in accordance with the original requirements and meet the following requirements:
(3) ① gauge deviation of not more than its nominal value of 1 / 1000;
(4) ② in the vertical and horizontal direction of the tilt of the top rail is less than 1 / 1000
(5) ③ two tracks of joints must be staggered. Rail joint gap between the 3 ~ 6mm, joints should be mounted on the sleepers, both ends of the height difference of less than 2mm;
(6) ④ 1 m away from the track end position stop device must be set to limit its height should be no less than the travel wheel radius;
(7) ⑤ embankment next to the excavation of drainage ditches should be;
(8) ⑥ crane during the construction period, in order to track weekly basis or after the rain celebrate checked and found that non-compliance should be timely adjusted.
(9) (2) the installation of cranes, lifting, demolition must be in accordance with the original provisions, and to develop measures for safe operation, by a professional team (group) in the team (group) is responsible for reunification under the guidance of, and for technical and monitoring the presence of security personnel.
(10) (3) crane installed, in case of no load, the tower and degree of deviation of the vertical surface shall not exceed
(11) 3 / 1000.
(12) (4) Crane-specific temporary power distribution box, should set the middle of the track near the power switch should be in line with specified requirements. Cable reel to run flexible, safe and reliable, no rope.
(13) (5) The crane must be installed on walking, amplitude, hook height limit and the torque limiter device safety devices, and to ensure that sensitive and reliable. On a lift crane cab, broken rope protection device must be reliable.
(6) tower crane body, shall not be hoisted placards.