壁柜、吊柜安裝技術(shù)交底.doc
進(jìn)入下載頁
交底內(nèi)容:
壁柜、吊柜安裝
本技術(shù)交底適用于一般建筑和賓館建筑壁柜、吊柜安裝工程。
1.材料要求
(1)壁柜、吊柜木制品由工廠加工成品或半成品,木材含水率不得超過12%。加工的框和扇進(jìn)場時(shí)應(yīng)對(duì)型號(hào)、質(zhì)量進(jìn)行核查,需有產(chǎn)品合格證。
(2)其他材料:防腐劑、插銷、木螺絲、拉手、鎖、碰珠、合頁按設(shè)計(jì)要求的品種、規(guī)格備齊。
2.主要機(jī)具
(1)電焊機(jī)、手電鉆。
(2)大刨、二刨、小刨、裁口刨、木鋸、斧子、扁鏟、木鉆、絲錐、螺絲刀、鋼水平、鑿子、鋼銼、鋼尺。
3.作業(yè)條件
(1)結(jié)構(gòu)工程和有關(guān)壁柜、吊柜的構(gòu)造連體已具備安裝壁柜和吊柜的條件,室內(nèi)已有標(biāo)高水平線。
(2)壁柜框、扇進(jìn)場后及時(shí)進(jìn)行加工并靠墻、貼地、頂面應(yīng)涂刷防腐涂料,其他各面應(yīng)涂刷底油一道,然后應(yīng)分類碼放平整,底層墊平,保持通風(fēng),一般不應(yīng)露天存放。
(3)壁柜、吊柜的框和扇,在安裝前應(yīng)檢查有無竄角、翹扭、彎曲、劈裂,如有以上缺陷,應(yīng)修理合格后,再行拼裝。吊柜鋼骨架應(yīng)檢查規(guī)格,有變形
Cards on the table contents:
Cabinets, hanging cabinet installation
The technical disclosure for general construction and hotel building cabinets, hanging cabinet installation.
1. Material requirements
(1) cabinets, wood hanging cabinet, or semi-finished products from the factory, wood moisture content should not exceed 12%. Processing comes into the box and fan response model, the quality of verification, the need for product certification.
(2) Other materials: preservatives, bolt, wood screws, handles, locks, touch beads, hinge according to design requirements of the varieties, specifications get ready.
2. Major equipment
(1) welding machines, hand drills.
(2) a large plane, two plane, small plane, cut mouth planing, wood saw, axes, flat shovel, wood drill, tap, screwdriver, steel level, chisel, steel file, steel rule.
3. Operating conditions
(1) structural engineering and the cabinet, hanging cabinet piece has been the construction of installation of cabinets and hanging cabinet with the condition, interior has elevation level.
(2) cabinet box fan after the timely processing of admission and the wall, paste, the top anti-corrosion coating to be brush, brush the other side should be a base oil, and should be classified laying is flat, the bottom level up, to keep Ventilation should not generally open storage.
(3) cabinet, hanging cabinet box and the fan, before the installation check for channeling angle, Alice twisting, bending, splitting, if these defects should be repaired after passing the re-assembly. Should check the specifications of steel skeleton hanging cabinet, there is a deformation
