現(xiàn)澆水磨石地面施工技術交底.xls.xls
進入下載頁
一、施工準備
(一)作業(yè)條件
1、頂棚、墻面抹灰已完成,并已驗收,屋面已做完防水層。墻面已彈好+50mm標高水平線。
2、安裝好門框并加防護,與地面有關的水、電管線已安裝就位,穿過地面的管洞已堵嚴、堵實。
3、做完地面墊層,按標高留出磨石層厚度(至少3mm)。
4、石粒應分別過篩,并洗凈無雜物。
(二)材質(zhì)要求
First, construction preparation
(A) Operating conditions
1, ceiling and wall plaster have been completed and acceptance, roof waterproofing has been done. Wall has a good +50 mm shells elevation level.
2, installed door frame and add protection, and ground the water and electricity lines have been installed in place, through the surface of the tube holes are blocked Yan, blocking real.
3, finished floor cushion, leaving a millstone by elevation of the thickness (at least 3mm).
4, stone tablets should be separately sieved and washed debris-free.
(B) material requirements