1、 進入施工現場必須遵守南靖信達建筑工程有限公司的各項安全生產規章制度和紀律。
2、 室內抹灰使用的木凳、金屬支架應搭設平穩牢固,腳手板高度不大于2m,架子上堆放材料不得過于集中,存放砂漿的灰斗、灰桶要放穩。
3、 搭設腳手架不得有蹺頭板,并嚴禁腳手板支擱在門窗、上下水的管道上。
4、 操作前應檢查架子、高凳等是否牢固,如發現不安全地方立即作加固等處理,不準用50×100mm、40×60mm的楞木(2m以上跨度)、鋼模板等作為立人板。
5、 攪拌砂漿與抹灰作業時,尤其在抹頂棚時,應注意灰漿濺入眼內。
6、 在室內推運輸小車時,特別是在過道中拐彎時要注意小車擠手。在推小車時不準倒退。
7、 嚴禁從窗口向下隨意拋擲東西。
8、 井架吊籃起吊或放下時,必須關好井架安全門,頭、手不得伸入井架內,待吊籃停穩,方可進入吊籃內工作。
9、嚴禁操作人員在酒后進入施工現場作業。
10、每個工人進入施工現場都必須頭戴安全帽。
11、班組如果因勞力不足需要再招新工人時,應事先向工地報告。
12、新工人進場后應先經過三級安全交底,并經考試合格后方可讓其正式上崗。
13、新工人進場應具有四證,即:職業資質證、身份證、計劃生育證和外來人口暫住證。
Abstract:
1, into the construction site must comply with Construction Co., Ltd. Nanjing Cinda all safety regulations and discipline.
2, interior plaster used wooden bench, erection of stable metal stent should be firm, Scaffold board height of not more than 2m, shelf stacking material may not be too concentrated, stored mortar ash bucket, ash bucket to put stability.
3, erection of scaffolding may not have toggle head board, and support non-Scaffold board put in windows and doors, up and down the water pipe.
4, the shelf should be checked before operation, whether the high stool so strong, such as unsafe places such as immediate treatment for reinforcement are not allowed to use the 50 × 100mm, 40 × 60mm in leng wood (2m above span), such as steel formwork Liren board.
5, mixing mortar and plastering operations, especially in the wiping ceiling, splashing into eyes should be noted that within the mortar.
6, in the room pushing the transport of small cars, particularly when turning in the aisle in the car should pay attention to squeeze hands. In the small car are not allowed to push back.
7, is prohibited from the free throw things down the window.
8, Derrick basket lifting or down, you must turn off the derrick safety gate, head, hands shall not extend into derrick, pending the basket a parked to enter the basket to work.
9, is strictly prohibited operators in the drink to the construction site work.
10, each worker entering the construction site must be wearing helmets.
11 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
12, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
13, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.