016乳膠漆飾面施工技術交底.pdf
進入下載頁
交底內(nèi)容:
A、施工準備:
2.1 材料要求:
2.1.1 涂料:乙酸乙烯乳膠漆。應有產(chǎn)品合格證、出廠日期及使用說明。
2.1.2 填充料:大白粉、石膏粉、滑石粉、羧甲基纖維素、聚醋酸乙烯乳液、地板黃、紅土子、黑煙子、立德粉等。
2.1.3 顏料:各色有機或無機顏料,應耐堿、耐光。
2.2 主要機具:
2.2.l 一般應備有高凳、腳手板、半載大桶、小油桶、銅絲籮、橡皮刮板、鋼片刮板、膩子托板、小鐵鍬、開刀、膩子槽、砂紙、笤帚、刷子、排筆、擦布、棉絲等。
2.3 作業(yè)條件:
2.3.1 墻面應基本干燥,基層含水率不得大于10%。
2.3.2 抹灰作業(yè)已全部完成,過墻管道、洞口、陰陽角等應提前處理完畢,為確保墻面干燥,各種穿墻孔洞都應提前抹灰補齊。
2.3.3 門窗玻璃要提前安裝完畢。
2.3.4 地面已施工完(塑料地面、地毯等除外),管道設備安裝完,試水試壓已進行完。
2.3.5 大面積施工前應事先做好樣板間,經(jīng)有關質(zhì)量部門檢查鑒定合格后,方可組織班組進行大面積施工。
2.3.6 冬期施工室內(nèi)涂料工程,應在采暖條件下進行,室溫保持均衡,一般室內(nèi)溫度不直低于+10℃,相對濕度為 60%,不得突然變化。同時應設專人負責測試和開關門窗,以利通風排除濕氣。
B、操作工藝:
3.1 工藝流程:
Cards on the table contents:
A, construction preparation:
2.1 Material Requirements:
2.1.1 Coatings: vinyl acetate emulsion paint. Should product certification, manufacture date and instructions.
2.1.2 filler: The white powder, gypsum powder, talcum powder, carboxymethyl cellulose, polyvinyl acetate emulsion, floor yellow, red son, smoke son, lithopone so.
2.1.3 pigments: organic or inorganic colored pigments, should be alkali-resistant, light-fastness.
2.2 Main equipment:
2.2.l should normally have high stool, scaffold board and half a bucket, a small oil drums, wire baskets, rubber scraper, steel scraper, putty pallets, small shovel, knife, putty groove, sand paper, broom , brush, brush, rags, cotton, silk and so on.
2.3 Operating conditions:
2.3.1 The wall should be the basic dry, grass-roots level not more than 10% moisture content.
2.3.2 plaster work has been completed, over the wall pipe, hole, horn, etc. Yin and Yang should be disposed of in advance, to ensure that the wall dry, all kinds of holes through the wall should be padded before plastering.
2.3.3 To advance the glass doors and windows installed.
2.3.4 Construction of the ground has been completed (plastic surface, except carpet, etc.), plumbing installed, test the water pressure test carried out completed.
2.3.5 Construction of large area well in advance before the model, the quality of departments by the accredited inspection only after the construction of a large area organized team.
2.3.6 Construction of indoor winter paint project should be carried out under heating conditions, at room temperature to maintain a balanced, general indoor temperature does not always lower than +10 ℃, relative humidity 60%, no sudden changes. At the same time should be set specifically responsible for testing and switch windows to facilitate ventilation and exclude moisture.
B, operating processes:
3.1 Process: