建設工程勘察設計合同(2).doc
進入下載頁
建設工程勘察設計
合同(2)
委托方____(以下簡稱甲方)
承包方____(以下簡稱乙方)
依照《中華人民共和國經濟合同法》、《建設工程勘察設計合同條例》的有關規定,經雙方協商一致,簽訂本合同。
第一條 甲方委托乙方承擔的工程勘察設計項目名稱、內容、規模與范圍詳見委托勘察設計項目表(見附件)。
第二條 乙方根據委托的勘察設計項目,和主管部門的規定,按初步設計(方案設計)和施工圖設計,分階段進行。在具備各個階段設計條件時,雙方簽訂階段協議書,具體規定甲方應提交的勘察設計基礎資料的名稱和日期,乙方需交付的勘察設計文件資料的名稱和日期,做為本合同的附件。
第三條 雙方責任
Construction Survey and Design
Contract (2)
Client ____( hereinafter referred to as Party A)
Contractor ____( hereinafter referred to as Party B)
In accordance with "The People's Republic of China on Economic Contracts Law", "Construction Survey and Design Contracts Regulations," the relevant provisions agreed by both parties signed this contract.
Party A Party B commissioned the first survey and design work undertaken by the project name, content, scale and scope of the detailed survey and design projects commissioned by the table (see annex).
B according to the second survey commissioned design projects, and the competent authorities of the provisions of the initial design (design) and construction design, a phased manner. At all stages of design conditions with the two sides signed an agreement stage, the specific provisions of the Survey and Design Party should be submitted to the name and date of the basic data, Party B shall deliver investigation and design documentation of name and date, as the annex to the contract .
Responsibility of the third parties
