連續梁群錨高強鋼絞線預應力施工工法.doc
進入下載頁
連續梁群錨高強鋼絞線預應力施工工法
編制單位:中建一局集團
批準部門:中國建筑工程總公司
工法編號:GF/201006-96
主要執筆人:朱勤
l工法特點 2
2適用范圍 2
3 Q M系列預應力材料及結構件 2
5工藝流程 5
6主要工序施工方法 5
7勞動力組織 8
8質量注意事項 9
9文明、安全施工措施 9
10經濟效益分析 9
11工程實例 9
Anchors beam construction method of high strength prestressed steel strand
Prepared by: China Construction First Bureau Group
Approval of department: China State Construction Engineering Corporation
Public Law Number: GF/201006-96
The main author of: Qin Zhu
Engineering characteristics of the method l 2
2 Scope 2
3 Q M Series 2 PC materials and components
5 Process 5
The main process of construction method 5 6
7, 8 labor organization
8 Quality Note 9
9, civilization, security, construction measures 9
10 Economic Analysis 9
9 of 11 Projects
