顆粒砂漿保溫(外飾為貼磚的)施工工藝
一、作業(yè)條件:
1、基層墻體的質(zhì)量必須符合相關(guān)質(zhì)量驗(yàn)收規(guī)范和標(biāo)準(zhǔn)要求,主體結(jié)構(gòu)已驗(yàn)收,并辦理四方驗(yàn)收手續(xù)。
2、腳手架和外用電梯安裝完畢并通過驗(yàn)收。
3、外門窗通過驗(yàn)收并有相應(yīng)成品保護(hù)措施。
4、外陽臺(tái)部位電器暗管,接線盒安裝完畢,外墻雨水管卡預(yù)埋完畢。
5、FIRST B.M體系正常施工溫度5℃以上,風(fēng)力超過5級或中雨以上天氣不得施工。施工完畢后應(yīng)防止陽光直曬。
二、主要材料與施工工具:
Particles mortar insulation (exterior for the tiling of the) construction technology
1, operating conditions:
1, the quality of primary wall must comply with the relevant norms and standards of quality acceptance, the main structure has been acceptance and acceptance procedures for handling the Quartet.
2, scaffolding and elevator installed by external inspection.
3, external doors and windows finished products through inspection and have the corresponding protection measures.
4, outside the balcony of electrical underground pipe, junction boxes installed, external rainwater pipes embedded cards completed.
5, FIRST BM system in normal working temperature of 5 ℃, wind more than 5 or moderate rain over the weather may not construction. After construction should prevent direct sunlight.
Second, the major materials and construction tools: