衛浴潔具安裝工藝流程
衛浴潔具安裝工藝流程衛生間的裝飾重點:
一是墻磚。二是衛生潔具。
(一)施工工藝流程
鑲貼墻磚→吊頂→鋪設地磚→安裝大便器、洗臉盆、浴盆→安裝連接給排水管→安裝燈具、插座、鏡子→安裝毛巾桿等五金配件。
1.坐便器的工藝流程
檢查地面下水口管→對準管口→放平找正→畫好印記→打孔洞→抹上油灰→套好膠皮墊→擰上螺母,→水箱背面兩個邊孔畫印記,
→打孔迦肼菟ā砝巍乘涔曳牌秸藝∩下菽浮滄氨乘湎濾渫貳昂冒俗置擰涯锏撇嬙浜謾迦肫用藕桶俗置擰〗袈菽浮?
2.洗臉盆的工藝流程
膨脹螺栓插入→捻牢→盆管架掛好→把臉盆放在架上找平整→下水連接:臉盆→調直→上水連接。
3.浴盆的工藝流程
浴盆安裝: →下水安裝→油灰封閉嚴密→上水安裝→試平找正
4.淋浴器的工藝流程
冷、熱水管口用試管找平整→量出短節尺寸→裝在管口上→淋浴器銅進水口抹鉛油,纏→螺母擰緊→固定在墻上→上部銅管安裝在三通口→木螺絲固定在墻上。
5.凈身器的工藝
Sanitary ware installation process
Installation of bathroom sanitary ware decoration process focus:
The first wall. Second, sanitary ware.
(A) construction process
Xiangtie ceiling wall → → → floor tiles installed devices stool, washbasin, bathtub installation connected to the drain → → install lights, outlets, mirrors, towel rods, etc. → Installation Hardware.
1. Toilet of the process
Check the ground Xia Shuikou aligned nozzle tube → → → paintings are flat to find a good hole to play imprint → → → smeared putty good rubber mat set screw on the nut →, → water tank on the back of the two paintings side hole mark
→ punch hydrazine dodder ā Buddha Fa Wei by Cenyepaijie under Art ∩ Tsang Shu floating by drunk ammonia filter Xie II Aung Maosuzhining Yajianpieqiang Bangman Buddha gizzard with lotus Tongsuzhining 〗 carriageway beans float?
2. Washbasin in the process
Expansion bolt firmly → Insert → twist coil frame hung → formation of the basin on the shelves to find link → water: basin → Straightening → Sheung Shui connection.
3. Tub process
Bathtub installation: → install → Putty closed water tight installation → test → Sheung Shui Ping Alignment
4. The process flow shower
Cold and hot water nozzle with a flat tube to find a short section of Expenditure and size → → → mounted shower nozzle on the intake of copper lead wiping the oil, tighten the nut wrapped → → → top brass fixed to the wall I installed in the three links → wood screws fixed to the wall.
5. Bidet process