       整體爬升式腳手架施工方案
      本工程主體高度為71.2米,結(jié)合建筑物結(jié)構(gòu)形式,根據(jù)本公司類似工程的施工管理經(jīng)驗(yàn),四層以下采用雙排落地式鋼管扣件腳手架,四層以上采用整體爬升式腳手架。
      節(jié)11.1爬升外腳手架的設(shè)計(jì)構(gòu)想
      腳手架以不大于7m的跨度為一個單元,共設(shè)30個承力底托,30個挑梁及電動葫蘆,架體共12步加一步護(hù)身欄,總高18.60m,橫豎桿間距1.4m左右,雙排架子寬0.8m,里排桿距建筑物0.5m,架體最下面一步架為承力桁架,承力桁架部分每個節(jié)間均設(shè)斜腹桿。承力桁架兩端坐落在承力底托上,承力底托里端用M22螺栓與建筑物邊梁固定,外端用φ25斜拉桿與上一層邊梁拉結(jié),懸掛電動葫蘆的挑梁固定方法同承力底托。
      節(jié)11.2爬升外腳手架的安裝及提升工藝流程
          1、安裝工藝流程:
      搭設(shè)操作平臺架子→安裝承力底托→搭設(shè)承力桁架→搭設(shè)整個架體→設(shè)立拉結(jié)點(diǎn)→架體鋪板、掛網(wǎng)→安裝挑梁、電動葫蘆→連接葫蘆與承力底托→安裝防外傾裝置→安裝防墜落→檢查驗(yàn)收。
      2、提升工藝流程:
      檢查掛鉤→松開所有固定拉結(jié)→撤離架體上所有活荷載→短暫開動葫蘆、繃緊鏈條→調(diào)整葫蘆鏈條使之受力均勻→拆除承力底托與建筑物的連接→開機(jī)提升,觀察同步情況→提升到位安裝承力底托→安裝承力底托拉結(jié)點(diǎn)→檢查驗(yàn)收后提供使用。
      在使用期間將挑梁、電動葫蘆升到上一層以備下
      Climbing Scaffolding overall construction plan
      The works of the main height of 71.2 meters, combined with the building structure, according to the company's construction management experience in similar projects, the following four double floor steel fasteners used scaffolding, used for more than four overall climb scaffold.
      Section 11.1 to climb scaffolding outside the design concept
      Scaffolding in the span of less than 7m as a unit, a total of 30 load-bearing end of care, 30 percent of beam and electric hoist, rack body 12 Step by step Protection Gear column, total height 18.60m, 1.4m spacing bar anyway about double the shelf width 0.8m, shot from the inside row of buildings 0.5m, rack on the bottom step frame for the load-bearing truss, load-bearing part of each truss section located between the oblique belly bar. Bearing truss ends located in the bearing mountings, bearing with M22 bolt bottom end Tory Building side beams and stationary, the outer end with a φ25 rod and the layer of oblique edge beam Rachel, hanging electric hoist the cantilever beam fixation with the bearing pedestal.
      Section 11.2 to climb scaffolding outside the installation and upgrade process
          1, the installation process:
      Erection platform shelf installation bearing pedestal → → → erection truss erection bearing the rack on the establishment of Latin Node → → rack on ceiling, hanging net → install the roof beam, electric hoist hoist and bearing → Connection → install anti-base care extraversion install fall protection devices → → examination and acceptance.
      2, enhance the process:
      Check hook → release → Rachel withdrawal of all fixed frame body of all the live load → short starting block, tighten the chain hoist chain → adjusted so that the balanced force → removal of bearing pedestal and start building connections → enhanced observation → improve synchronization conditions in place to install bearing installation bearing bottom end of care → node → Torah, after inspection and acceptance of their use.
      During the use of cantilever beam, electric hoist to rise to the level to prepare for the next
       

      下載地址

      前往下載

      主站蜘蛛池模板: 77777av| 免费国产一区二区在免费观看| 国产亚洲精品久久久久久久软件| 久久国产自偷自偷免费一区| 亚洲精品第一页不卡| 日本熟妇人妻xxxxx人hd| 国产精品午夜无码AV天美传媒| jlzzjlzz欧美大全| 日本色色网| 亚洲?欧美?人妻| 亚洲AV日韩AV激情亚洲| 97国产超碰一区二区三区| 91乱码一区二区三区| 自拍偷拍亚州精品视频| 国产精品中文第一字幕| 日韩av激情在线| 一区二区国产精品精华液| 色综合久久中文字幕| 国产午夜精品理论片A级在线观看 国产欧美亚洲精品第3页在线 | 国产情侣草莓视频在线| 国产无遮挡猛进猛出免费| 76少妇精品导航久久久久| 精品国产一卡| 亚洲成a人片在线不卡一二三区| 无码一区二区三区AV免费| 无码一区二区三区AV蜜桃视| 久久精品蜜芽亚洲国产av| 色综综| ww污污污网站在线看com| 久久精品人妻无码一区二区三区| 亚洲色婷婷一区二区三区| 亚洲第一免费播放区| 蜜桃视频网站| 激情内射亚洲一区二区三区| 先锋丝袜人妻久久| 国内少妇人妻丰满av| 国产一区二区日韩经典| 国产亚洲欧美精品久久久| 国产成人综合亚洲网| 国产91精品最新在线播放| 精品视频在线观看你懂的一区|