• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看

      邊坡支護及土方開挖方案.doc

      更新時間: 2024-02-18
      下載權限: 免費會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數:
      上傳會員: lajks
      所屬欄目: 施工方案
      進入下載頁
      資料簡介

      一、 主廠房區域基礎開挖特點:
      1、 根據地質資料,主廠房區域地表下的淤泥層深達10m,主廠房基礎一般座落在③淤泥質粉質土層中。本工程土建結構位于軟土地基上,樁基保護是本工程土建基礎施工的一大重點和難點。
      2、 主廠房內部基礎埋深相差較大,汽機基礎比汽機間框架基礎深3.5m;凝泵坑基礎比汽機基礎深0.5m;循環水閥門井及其相鄰的A排基礎底板整體現澆,底標高比汽機基礎深1m、比A排其它基礎深4.5m;A排外進排水管比A排其它基礎深2.9m。這些布置特點,大大增加了土建地下部分的施工難度,給樁基保護提出了更高的要求。
      3、保證樁基不發生位移偏位現象,擬采取必要的支護措施即水泥攪拌樁支護方案,在主廠房基坑四周布置多排水泥攪拌樁,形成水泥土擋墻。
      4、土方開挖底標高已低于地下水位,淤泥質土層的透水性很小,降水效果不明顯。 
      二、 支護方案
      1、 在主廠房基坑周邊、煙囪基坑周邊、循環水管溝基坑周邊,布置水泥攪拌樁。
      鍋爐房、除氧煤倉間、汽機房(除A排)基坑,布置四排雙頭水泥攪拌
      First, the foundation excavation of the main powerhouse features:
      1, according to geological data, the main plant area of surface layer of silt under the deep 10m, based on generally located in the main building ③ silty soil. The civil works structures located in soft soil, pile protection is the basis of the civil works construction of a major important and difficult.
      2, the main difference between the plant and the basis of depth greater than the steam turbine steam turbine foundation based on inter-frame depth 3.5m; condensate pump steam turbine foundation pit of deep foundation than 0.5m; recycled water wells and the adjacent A valve arrangement of the base as a whole is casting, the bottom elevation than the turbine foundation depth 1m, other than the basic A row of deep 4.5m; A exclusion into the basis of drainage other than the A row of deep 2.9m. The layout features, which greatly increased the difficulty of civil underground construction, pile protection to a higher demand.
      3, to ensure that displacement does not occur pile deviation phenomenon, to be taken the necessary support measures that support the program of cement mixing pile, arranged around the pit in the main plant more rows of cement mixing to form a cement retaining wall.
      4, the end of earth excavation below the water table elevation has, silty soil permeability is small, the precipitation effect was not obvious.
      Second, support programs
      1, in the main plant around the foundation, chimney foundation pit, circle pit around the pipe trench, decorated cement mixing pile.
      Boiler room, oxygen removal coal bin, the steam room (except row A) excavation, cement-head arrangement of four rows
       

      下載地址

      前往下載

      主站蜘蛛池模板: 亚洲第一天堂无码专区| 成人人妻精品| 激情的视频一区二区三区| 亚洲日产韩国一二三四区| 日韩在线播放欧美字幕| 国产精品福利自产拍久久| 国产va免费观看| 日韩久久久久久| 92精品国产自产在线观看481页| 亚洲一区二区三区含羞草| 一本大道无码av天堂| 丰满人妻一区二区三区在线视频53| 狠狠色噜噜奇米777me第四| 亚洲成人有码免费在线| 伊人精品成人久久综合97| 亚洲黄色精品| 国产成人精品av| 尤物com| 国产精品午夜剧场免费观看| 中文字幕日韩有码一区| 国产精品你懂的在线播放| 国产老熟妇| 人妻护士在线波多野结衣| 四虎视频在线观看| 国产精品对白交换视频| 久热这里只国产精品视频| 岛国av免费观看| 婷婷精品国产亚洲av| 久久人妻中文| 蜜臀av一区二区精品字幕| 影音先锋一区二区三区| 丰满人妻被黑人中出849| 又污又爽又黄的网站| 亚洲欧洲av一区二区久久| 精品国产三级在线观看| 日韩AV高清在线看片| 亚洲国产青草衣衣一二三区| 无码精品人妻| 国产黄在线观看免费软件下载| 国产熟女精品一区二区三区| 一亚洲一区二区中文字幕|