十七、施工試驗方案.doc
進入下載頁
1、工程概況
北京××工程位于××區(qū)××路××號,總建筑面積××m2,基地尺寸41.16×43.96m。地下二層,地上十六層,結(jié)構(gòu)型式全現(xiàn)澆框架一筒體結(jié)構(gòu),±0.000相當絕結(jié)標高51.70m,設計室外地坪為-0.45m,基底埋深-10.75m,檐高59.65m,建筑物總高65.40m。
現(xiàn)場試驗室設置在施工現(xiàn)場西南角,離建筑物15m左右,便于結(jié)構(gòu)施工相對現(xiàn)場各種材料進行取樣,對進場 的混凝土及時進行坍落度測試和試塊制作,并及時將試塊送入養(yǎng)護室進行養(yǎng)護,基養(yǎng)護室采用自動溫濕控制儀控制,保證養(yǎng)護室內(nèi)標準溫濕高。
2、設計要求
2.1基礎結(jié)構(gòu)
基礎結(jié)構(gòu)表參數(shù)表 表1-1
1, Project Overview
Project is located in Beijing × × × × × × district × × Road, with a total floor area × × m2, base size of 41.16 × 43.96m. Basement level, ground floor 16, the structure of a tube type frame structure of the whole cast, ± 0.000 rather must end elevation 51.70m, design outdoor terrace to-0.45m, basement depth-10.75m, high eaves 59.65m, The total building high-65.40m.
Field laboratory set up at the construction site southwest corner, about 15m away from the building, structure, construction is relatively easy to sample a variety of materials on site, on the approach of the concrete slump tests, and timely production of test blocks and test block in time into Maintenance Room maintenance, base maintenance room temperature and humidity control device of automatic control, ensure maintenance of indoor temperature and humidity high standard.
2, the design requirements
2.1 Infrastructure
Infrastructure Table 1-1 Table Parameter List